Exhibition Centre Basel 2012 |
2008
|
CH |
|
|
Expanding the scope of Minergie standards to include electric vehicles |
2018
|
CH |
|
|
Expansion at Munich Airport |
2007
|
DE |
|
|
Expansion of a University Building at Plattenstrasse 14 in Zurich |
2018
|
CH |
|
|
Expansion of highway in Dietikon |
2020
|
CH |
|
|
Expansion of rail line between Hüntwangen and Neuhausen |
2013
|
CH |
|
|
Expansion of the IPW Klinik Schlosstal |
2021
|
CH |
|
|
Expansion of the Stuttgart Urban-Suburban Railway (S-Bahn) |
2017
|
DE |
|
|
Expansion of the Zürich Oerlikon Railway Station |
2017
|
CH |
|
|
Expansion phase 2035 of the strategic railway infrastructure development program |
2025 |
CH |
|
|
Expedited environmental impact assessment |
2022
|
CH |
|
|
Expert audit for the compliance with RAMS-requirements of the Gotthard Base Tunnel |
2025 |
CH |
|
|
Expert dialogue on drainage at Zurich Airport |
2020
|
CH |
|
|
Expert Report on dealing with local water shortages |
2015
|
CH |
|
|
Expert review of the Bözberg tunnel construction project |
2017
|
CH |
|
|
Expert review of the Bruggwald, Galgentobel and Sturzenegg Tunnels refurbishment project |
2017
|
CH |
|
|
Expert Study on the Swiss Gold Sector and related Risks of Human Rights Abuses |
2017
|
CH |
|
|
Explainer video and infographic poster about monitoring pharma shipments |
2019
|
CH |
|
|
Explanatory video about Carbon Capture and Utilisation |
2017
|
DE |
|
|
Explanatory video for Minergie |
2016
|
CH |
|
|